Due
to the underlying commitment to professionalism and synergy of all
levels of staff, with skills and technology spanning every aspect
of the business, M.R. AL-KHATHLAN (MRK) has won a stunning array of
testimonials and appreciations rewards from its highly reputed clients:
- Upgrade Al-Hassa Electrical Distribution System
-SAUDI ARAMCO
---------------------------------------------------------------------
We take this opportunity to express our gratitude and appreciation for the great efforts and exceptional performance of M. R. Al-Khathlan Est. (MRK), the main construction contractor, who managed the various construction phases of Al-Hassa Electrical System Upgrade project.
SAPMT hereby acknowledges the commitment and dedication demonstrated by MRK management in the execution of their contracted work, which helped achieve the successful completion of the project two months ahead of the contract schedule.
- Construction of 110/13.8kV Mohammadiyah Substation, Jeddah
-SAUDI ARAMCO
---------------------------------------------------------------------
Saudi Electricity Company wishes to express its appreciation to M.R. Al-Khathlan Est. (MRK) for their performance in the construction of Mohammadiyah 110/13.8kV Substation on LSTK basis.
MRK have proven their capabilities to execute the project as per the specification of SEC (WR) within the time frame allowed, through the extensive efforts and the dedication of its team which concluded a successful completion of the above mentioned project.
- Electrical
System Upgrade, Northern Area Producing, Phase I
-SAUDI ARAMCO
---------------------------------------------------------------------
We were particularly pleased with M. R. Al-Khathlan Est. (MRK)
ability to complete this project two (2) months ahead of the LSTK
contract schedule, which is six (6) months ahead of the PMT schedule.
Your ability to expedite long-lead materials and desire to satisfy
Saudi Aramco were keys to your success. The quality of the installation
was high, ensuring prompt acceptance of the facilities by the
Operating Organization.
During the project MRK maintained an exemplary safety record,
with no lost time accidents or injuries. The installed facilities
were safely cutover and have enhanced the reliability of the
Tanajib and Safaniya medium voltage electrical systems.
- Offsite
Utilities at Rabigh Refinery
-SAUDI ARAMCO
---------------------------------------------------------------------
This is to express my sincere thanks to the management of M.R.
Al-Khathlan Est. for having extended their full support &
cooperation in completing the Rabigh Refinery T & I, March
2006, successfully in a safe manner without any loss time incident.
- Construction
of Production Master Control Room
-AL KHAFJI JOINT OPERATIONS
---------------------------------------------------------------------
"I would like to express my appreciation to M.R. AL-KHATHLAN
(MRK) for the safe and efficient completion of the Shutdown and
overall activities of the project. Especially, the Total Plant
Shutdown which was completed ahead of the agreed time for completion;
this is a highly commendable achievement for a highly complex
project of this nature that involved much more than the Blast
Resistant PMCR building itself. MRK performed engineering, procurement,
installation and commissioning of the integrated systems consisting
of Distributed Process Control System (DPCS), Fire Protection
Data Communication System, Optical Data Highway System, Offshore
Loading Control System, Tank Gauging System, Two Wire Control
System, etc. that demonstrate the complexity of the work. We also
appreciate the commitment of AL-KHATHLAN's top management in achieving
completion, as the efforts made have been exemplary."
-
Construction
Support Services at Riyadh Refinery
-SAUDI
ARAMCO
---------------------------------------------------------------------
"Team effort was the practice on this project and it was
a pleasure to work with a contractor having the commitment displayed
by M.R. AL-KHATHLAN in completing this project."
-
Test
and Inspection of Boilers and Auxiliaries, Ghazlan Power Plant
-SAUDI ELECTRICITY COMPANY
---------------------------------------------------------------------
"I would like to express my appreciation to your excellent
efforts in completing the T & I activities on Unit-2 and
Units 1 & 2 common items. This was the first time in Ghazlan's
history that the Unit was brought back on line four days ahead
of schedule".
- Telecommunication
Support for Product Supply System
-SAUDI ARAMCO
----------------------------------------------------------------------
"We
wish to express our appreciation for an excellent job at Riyadh.This
is with respect to the Fiber Optic Communication System and Meredian
Switch installation and cutover".
-
Storage
Tank Repair Contracts
-SAUDI ARAMCO
---------------------------------------------------------------------
“We would like to express our appreciation for the good performance
on the successful completion of repair works on tank T-721 &
T-722 at Dhahran Tank Farm. We appreciate that in spite of tight
schedule and technical nature of work, the activities completed
on schedule and in a professional manner.”
- Plant Maintenance and
Repair Projects
-SAUDI ARAMCO
--------------------------------------------------------------------
"AL-KHATHLAN has supplied quality, highly skilled
and productive contractor personnel to Drilling Maintenance Division.
Your interaction with Drilling Maintenance Division has helped
prevent any problems from arising".
|
|