Project Description

Scope Of Work

Project management, installation, testing and pre-commissioning of all the facilities related to the ethane metering project at Arabian Petrochemical Company (Petrokemya). The scope of this project covers:

  • Ethane Metering System, which includes meter skid, flow computer cabinet, cables, wiring, access platforms, sun-shade, etc.
  • 2 no. x Ethane Inlet Filters, including the loading of filter media and supply/install of access platform structure.
  • 1 no. x Air Surge Drum that will be connected to Petrokemya existing instrument air system and supply dry air to new EIV and other users in the area.
  • UPS System, which includes shelter, UPS, batteries, wiring, etc., including power supply feeders from existing substation to UPS Shelter.
  • Analyzer System, which includes Gas Chromatograph, gas bottles, shelter, wiring, etc.
  • Modification and refurbishment of the existing Metering Building to expand its size to accept the new flow computer cabinets, FCP, GCP and other panels required for this Project.
  • Fire and Gas Detection System, including detectors in the metering compound yard.
  • Extension of meter compound fence.
  • Tie-ins to existing Ethane distribution piping, utility piping and relief header piping.
  • Configuration of new I/O and graphics into existing DCS.
  • Earthworks, foundations, surfacing, grading, structural steel, platforms, piping, wiring, lighting, grounding, and all other interconnections to make a mechanically complete system that is ready for commissioning.