Due to the underlying commitment to professionalism and synergy of all levels of staff, with skills and technology spanning every aspect of the business. M.R. AL-KHATHLAN (MRK) has won a stunning array of testimonials and appreciations rewards from its highly reputed clients:

We take this opportunity to express our gratitude and appreciation for the great efforts and exceptional performance of M. R. Al-Khathlan Est. (MRK), the main construction contractor, who managed the various construction phases of Al-Hassa Electrical System Upgrade project.

SAPMT hereby acknowledges the commitment and dedication demonstrated by MRK management in the execution of their contracted work, which helped achieve the successful completion of the project two months ahead of the contract schedule.

SAUDI ARAMCO, Upgrade Al-Hassa Electrical Distribution System

Saudi Electricity Company wishes to express its appreciation to M.R. Al-Khathlan Est. (MRK) for their performance in the construction of Mohammadiyah 110/13.8kV Substation on LSTK basis.

MRK have proven their capabilities to execute the project as per the specification of SEC (WR) within the time frame allowed, through the extensive efforts and the dedication of its team which concluded a successful completion of the above mentioned project.

SAUDI ARAMCO, Construction of 110/13.8kV Mohammadiyah Substation, Jeddah

We were particularly pleased with M. R. Al-Khathlan Est. (MRK) ability to complete this project two (2) months ahead of the LSTK contract schedule, which is six (6) months ahead of the PMT schedule. Your ability to expedite long-lead materials and desire to satisfy Saudi Aramco were keys to your success. The quality of the installation was high, ensuring prompt acceptance of the facilities by the Operating Organization.

During the project MRK maintained an exemplary safety record, with no lost time accidents or injuries. The installed facilities were safely cutover and have enhanced the reliability of the Tanajib and Safaniya medium voltage electrical systems.

SAUDI ARAMCO, Electrical System Upgrade, Northern Area Producing, Phase I

This is to express my sincere thanks to the management of M.R. Al-Khathlan Est. for having extended their full support & cooperation in completing the Rabigh Refinery T & I, March 2006, successfully in a safe manner without any loss time incident.

SAUDI ARAMCO, Offsite Utilities at Rabigh Refinery

“I would like to express my appreciation to M.R. AL-KHATHLAN (MRK) for the safe and efficient completion of the Shutdown and overall activities of the project. Especially, the Total Plant Shutdown which was completed ahead of the agreed time for completion; this is a highly commendable achievement for a highly complex project of this nature that involved much more than the Blast Resistant PMCR building itself. MRK performed engineering, procurement, installation and commissioning of the integrated systems consisting of Distributed Process Control System (DPCS), Fire Protection Data Communication System, Optical Data Highway System, Offshore Loading Control System, Tank Gauging System, Two Wire Control System, etc. that demonstrate the complexity of the work. We also appreciate the commitment of AL-KHATHLAN’s top management in achieving completion, as the efforts made have been exemplary.”

AL KHAFJI JOINT OPERATIONS, Construction of Production Master Control Room

Team effort was the practice on this project and it was a pleasure to work with a contractor having the commitment displayed by M.R. AL-KHATHLAN in completing this project.”

SAUDI ARAMCO, Construction Support Services at Riyadh Refinery

“I would like to express my appreciation to your excellent efforts in completing the T & I activities on Unit-2 and Units 1 & 2 common items. This was the first time in Ghazlan’s history that the Unit was brought back on line four days ahead of schedule”.

SAUDI ELECTRICITY COMPANY, Test and Inspection of Boilers and Auxiliaries, Ghazlan Power Plant

“We wish to express our appreciation for an excellent job at Riyadh.This is with respect to the Fiber Optic Communication System and Meredian Switch installation and cutover”

SAUDI ARAMCO, Telecommunication Support for Product Supply System

“We would like to express our appreciation for the good performance on the successful completion of repair works on tank T-721 & T-722 at Dhahran Tank Farm. We appreciate that in spite of tight schedule and technical nature of work, the activities completed on schedule and in a professional manner.”

SAUDI ARAMCO, Storage Tank Repair Contracts

“AL-KHATHLAN has supplied quality, highly skilled and productive contractor personnel to Drilling Maintenance Division. Your interaction with Drilling Maintenance Division has helped prevent any problems from arising”.

SAUDI ARAMCO, Plant Maintenance and Repair Projects