Project Description

Scope of work

LSPB project for the installation of major electrical and control system equipment, cable trays, conduits and wireways, cable, wire, conduit and fixtures, connections, terminations, testing and pre-commissioning of all electrical and control systems.

Yanbu Gas Plant

  • Install six new Honeywell GUS stations and tabletops in the new console arrangement in the central control room;
  • Install 13 HPMs in the satellite instrument houses
  • Install 10 TMRs in the satellite instrument houses;
  • Install 13 UPS systems and batteries in substations;
  • Install Burner Management System for boilers;
  • Upgrade 2 ABB Vista workstations for the analyzers;
  • Integrate MOA data highway # 5 to Honeywell TDC-3000;
  • Modification of boiler nozzles to suite sales gas services;
  • Replace the obsolete pneumatic controllers and instrumentation;
  • Power, instrument and fiber optic cabling works;
  • Conduits, junction boxes, pull boxes installation to lay the cables;
  • Installation of cable trays; structural supports, etc.;
  • Structural supports to UPS, DCS and marshalling cabinets;
  • Pre-commissioning assistance to the vendors provided by Saudi Aramco

Yanbu Crude Oil Terminal

  • Replace existing SCADA and metering systems at YCOT;
  • Replace existing remote I/O mux houses with local marshalling cabinets;
  • Install new PLC cabinets at pump control and receiving metering control buildings;
  • Power and instrument cabling works;
  • Conduits pull boxes installation to lay the cables;
  • Installation of cable trays; structural supports, etc.;
  • Pre-commissioning assistance to the vendors provided by Saudi Aramco.

East/West Pipeline

  • Install densitometer RTUs c/w shades;
  • Install 22 protocol converters at pump stations and PRS-1;
  • Replace two ultrasonic flow meters at KP-1010;
  • Power and instrument cabling works;
  • Conduits pull boxes installation to lay the cables;
  • Pre-commissioning assistance to the vendors provided by Saudi Aramco.